It is important to be aware that we are unable to fully support time sensitive studies on Prolific at this point.

These include, but are not limited to:

  1. Studies that require participation/completion at a particular time of day
  2. Multi part and longitudinal studies, where the follow up studies are to be completed at a designated time

Although most studies run without a glitch, under some circumstances issues may be encountered with a survey, preventing the study from reaching completion on time.

It is also not possible for us to guarantee that participants will respond to surveys within the desired time window.

Please note: All time sensitive studies are run at the researchers own risk.

As always, if you would like to contact us please send an email to info@prolific.ac :)

Was this article helpful?
2 out of 4 found this helpful